VJT

M85 tunnel

Extension of ÜHK HSWIM system, Installation of video controller in Nagycenk

Completed: 2020/12

Client: DS Konzorcium

Building informatics

M44 highway

M44 Expressway expansion Tiszakürt-Kondoros 2×2 lanes operational communication phase III Kardos maintenance site operational communication phase III Tiszakürt-Kondoros 2×2 lanes expressway expansion operational communication phase I

Completion: 2019/4

Clients: Switelsky Építő Kft., Duna Aszfalt Zrt., Hódút Kft.

Building informatics

67 main road section between M7 highway and Kaposvár (North)

Development of main road no. 67 between the M7 motorway and Kaposvár (North) into a 2×2 cross-section – comprehensive implementation of the substructure network, superstructure, and system technology for the operational communication system required for the Kaposfüred bypass construction

Completed: 2023/12

Client: Duna Aszfalt Zrt.

Road transportation informatics

M85-ös autóút

M85 gyorsforgalmi út Fertőrákos csomópont-Sopron oh. Szakasz meglévő 84. sz. Főút Határátkelőhelyhez történő ideiglenes visszakötéssel, valamint a 8647. jelű Sopron ÉNY elkerülő út ÜHK rendszer tervezése, kivitelezése. Üzemi hírközlési rendszer tervezése, kivitelezése.

Tervezett befejezés: 2024/6

Megrendelők: Duna Aszfalt Zrt., SDD Konzorcium, PANTUNNEL Kft.

Közlekedésinformatika

M83-as gyorsforgalmi út

A Pápa-Győr szakasz informatikai hírközlő rendszer hálózatának tervezése és kivitelezése.

Átadás: 2023/10

Megrendelő: Duna Aszfalt Zrt.

Közlekedésinformatika